Case Study

Greene King – Bury St Edmunds.

A new speculatively SP160 forms one of three units within the third phase of speculative development at Suffolk Park. The unit comprises 160,708 sq ft was completed in 2023.
SJS Engineering have been appointed by Greene King to develop the existing Shell Install to their requirements.

Key Information

Client: Greene King – Bury St Edmunds
Sector: Commercial
Size: 160,708 sq ft Unit
Location: London
Status: Ongoing
SJS are developing the existing installed designs and issue Stage 3+ MEP Designs and then verify and site review inspections.